None
Last 25 builds Last 7 days Last 30 days Last 90 days All builds

Recent failures

Failed In Fixed In Time Taken To Fix
#190 Scheduled

#191 Scheduled

1 build

23 hours, 49 minutes

  • Average time to fix a failure: 23 hours, 49 minutes
  • Average number of builds between fixes: 1 builds
  • The longest time taken to fix a failure is 23 hours, 49 minutes, from failure starting in build #190.
  • The greatest number of builds taken to fix a failure is 1, from failure starting in build #190.