Verifies the integrety of the projects, as builds are executed immediately after a code change was detected. This plan provides no artifiacts (use a nightly build instead).

Build: #1151 failed Changes by drencrom <jorge@merlino.uy> and Guus der Kinderen

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
5 seconds
Labels
None
Agent
Default Agent
Revision
a6f7b978a4285576d24cfa59a20eb0080ca264eb
Failing since
#1148 (Changes by Guus der Kinderen and Dave Cridland <dave@cridland.net>)
Fixed in
#1153 (Manual run by daryl herzmann)
No failed test found. A possible compilation error occurred.

Responsible

  • Guus der Kinderen Guus der Kinderen Automatically assigned

Code commits

Author Commit Message Commit date
Guus der Kinderen Guus der Kinderen a6f7b978a4285576d24cfa59a20eb0080ca264eb Merge pull request #607 from drencrom/master
Add spanish translations
drencrom <jorge@merlino.uy> drencrom <jorge@merlino.uy> 2fec74b1995c2ca30dcc405ea06814e971ac6ac5 Add missing spanish translations
Also reorder other translations in the same order as english ones.
Now the file has the same number of lines as the english one to be able to find new items to translate easily.
drencrom <jorge@merlino.uy> drencrom <jorge@merlino.uy> db32bf15648e53d810be358f6fe8bb914544dad9 Merge pull request #1 from igniterealtime/master
Update to last version

Error summary for Build

The job generated some errors, drill down into the full build log for more details.

Could not find test result reports in the /var/atlassian/bamboo-home/xml-data/build-dir/OPENFIRE-TRUNK-JOB1 directory.
Unable to find executable at /opt/apache-ant-1.9.4/bin/ant. Will try to run it anyway.