Verifies the integrety of the projects, as builds are executed immediately after a code change was detected. This plan provides no artifiacts (use a nightly build instead).

Build: #2616 was successful Changes by daryl herzmann

Stages & jobs

  1. Default Stage

  2. Continuous Integration

Test results

  • 1,426 tests in total
  • 7 tests were quarantined / skipped
  • 8 minutes taken in total.
Skipped tests 7
Status Test Failing since View job
Skipped IQEntityTimeHandlerTest testPerformanceDatatypeConvertVsXMPPDateFormat
Build
Skipped CacheableOptionalTest cacheSizeOfPresentCacheableOptionalBooleanIsCorrect
Build
Skipped DefaultExternalizableUtilTest testWriteReadExternalizableCollection
Build
Skipped DefaultExternalizableUtilTest testWriteReadSerializableCollection
Build
Skipped DefaultExternalizableUtilTest testWriteReadSerializableMap
Build
Skipped DefaultExternalizableUtilTest testWriteReadStringCollection
Build
Skipped DefaultExternalizableUtilTest testWriteReadExternalizableMap
Build