Builds Spark (minus the Install4j distributables) after every change to the code.

Build: #42 was successful Changes by Alameyo <pawelsc@gmail.com> and Guus der Kinderen

Build result summary

Details

Completed
Queue duration
< 1 second
Duration
21 seconds
Labels
None
Agent
Default Agent
Revision
ed31921d33b27cd7d0288a0532a3e730eae384cb
Total tests
2
Successful since
#1 ()

Tests

  • 0 New failures
  • 0 Existing failures
  • 0 Fixed

Code commits

Author Commit Message Commit date
Guus der Kinderen Guus der Kinderen ed31921d33b27cd7d0288a0532a3e730eae384cb Merge pull request #352 from Alameyo/deleting_certificates
SPARK-1945, SPARK-1957, SPARK-1936
Alameyo <pawelsc@gmail.com> Alameyo <pawelsc@gmail.com> f38839561cfd8003c57779a6c5d26e794020b1b3 Bad labels.
Alameyo <pawelsc@gmail.com> Alameyo <pawelsc@gmail.com> f6a6da4c28af4434fb74ff859702bdb523266c98 Added deleting certificates and field with status of the certificate, also fixed bug with not displayable information about expired/not valid yet certificate.

Jira issues

IssueDescriptionStatus
Unknown Issue TypeSPARK-1936Could not obtain issue details from Jira
Unknown Issue TypeSPARK-1945Could not obtain issue details from Jira
Unknown Issue TypeSPARK-1957Could not obtain issue details from Jira